{"id":1620,"date":"2026-03-17T08:59:51","date_gmt":"2026-03-17T08:59:51","guid":{"rendered":"https:\/\/solutec-construccion.es\/desarrollo\/solutec-executes-the-strategic-adaptation-of-a-logistics-asset-in-pinto-madrid"},"modified":"2026-05-11T09:53:53","modified_gmt":"2026-05-11T09:53:53","slug":"solutec-executes-the-strategic-adaptation-of-a-logistics-asset-in-pinto-madrid","status":"publish","type":"post","link":"https:\/\/solutec-construccion.es\/en\/solutec-executes-the-strategic-adaptation-of-a-logistics-asset-in-pinto-madrid","title":{"rendered":"Solutec executes the strategic adaptation of a logistics asset in Pinto (Madrid)"},"content":{"rendered":"\n<p style=\"text-align:justify;\">We are pleased to announce that we are carrying out the <b>fit-out works in a newly constructed logistics warehouse located in Pinto (Madrid).<\/b> The project, developed for an important client, aims to immediately enable operational spaces to ensure a swift implementation for the future tenant.\n<\/p>\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n<p style=\"text-align:justify;\">The intervention focuses on the technical execution of <b>mezzanines and office spaces<\/b>, a growing trend where the property assumes the adaptation of the building to remove entry barriers for the logistics operator.<\/p>\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n<p style=\"text-align:justify;\">This &#8220;turnkey&#8221; strategy provides fundamental competitive advantages in the current market:<\/p>\n\n<p style=\"text-align:justify;\">\u25aa\ufe0f<b>Time-to-market:<\/b> Drastic reduction in start-up times for the operator.<br\/>\u25aa\ufe0f<b>Property valuation:<\/b> Direct improvement of the asset&#8217;s commercial positioning.<br\/>\u25aa\ufe0f<b>Operational efficiency:<\/b> Spaces designed for functionality from day one.<\/p>\n\n<h3>Specialized Technical Collaboration<\/h3><br\/><p style=\"text-align:justify;\">To ensure the highest quality standards and strict adherence to deadlines, Solutec leads the execution in direct coordination with <b>Dokei RE<\/b> and <b>DPI Ingenieros<\/b>. This technical alliance allows for comprehensive supervision that aligns end-user requirements with current regulations and construction efficiency.<\/p>\n\n<p style=\"text-align:justify;\">There is increasing demand for this type of work in newly constructed logistics warehouses, a market where SOLUTEC positions itself as the ideal partner for property owners.<\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"800\" data-id=\"980\" src=\"https:\/\/solutec-construccion.es\/desarrollo\/wp-content\/uploads\/2026\/03\/A-SOLUTEC-nave-en-Pinto.png\" alt=\"\" class=\"wp-image-980\" srcset=\"https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/A-SOLUTEC-nave-en-Pinto.png 1200w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/A-SOLUTEC-nave-en-Pinto-300x200.png 300w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/A-SOLUTEC-nave-en-Pinto-1024x683.png 1024w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/A-SOLUTEC-nave-en-Pinto-768x512.png 768w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/A-SOLUTEC-nave-en-Pinto-700x467.png 700w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"800\" data-id=\"985\" src=\"https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/C-SOLUTEC-nave-en-Pinto.png\" alt=\"\" class=\"wp-image-985\" srcset=\"https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/C-SOLUTEC-nave-en-Pinto.png 1200w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/C-SOLUTEC-nave-en-Pinto-300x200.png 300w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/C-SOLUTEC-nave-en-Pinto-1024x683.png 1024w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/C-SOLUTEC-nave-en-Pinto-768x512.png 768w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/C-SOLUTEC-nave-en-Pinto-700x467.png 700w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"800\" data-id=\"984\" src=\"https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/D-SOLUTEC-nave-en-Pinto.png\" alt=\"\" class=\"wp-image-984\" srcset=\"https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/D-SOLUTEC-nave-en-Pinto.png 1200w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/D-SOLUTEC-nave-en-Pinto-300x200.png 300w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/D-SOLUTEC-nave-en-Pinto-1024x683.png 1024w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/D-SOLUTEC-nave-en-Pinto-768x512.png 768w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/D-SOLUTEC-nave-en-Pinto-700x467.png 700w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"800\" data-id=\"986\" src=\"https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/B-SOLUTEC-nave-en-Pinto.png\" alt=\"\" class=\"wp-image-986\" srcset=\"https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/B-SOLUTEC-nave-en-Pinto.png 1200w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/B-SOLUTEC-nave-en-Pinto-300x200.png 300w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/B-SOLUTEC-nave-en-Pinto-1024x683.png 1024w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/B-SOLUTEC-nave-en-Pinto-768x512.png 768w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/B-SOLUTEC-nave-en-Pinto-700x467.png 700w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"800\" data-id=\"982\" src=\"https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/F-SOLUTEC-nave-en-Pinto.png\" alt=\"\" class=\"wp-image-982\" srcset=\"https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/F-SOLUTEC-nave-en-Pinto.png 1200w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/F-SOLUTEC-nave-en-Pinto-300x200.png 300w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/F-SOLUTEC-nave-en-Pinto-1024x683.png 1024w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/F-SOLUTEC-nave-en-Pinto-768x512.png 768w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/F-SOLUTEC-nave-en-Pinto-700x467.png 700w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"800\" data-id=\"983\" src=\"https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/E-SOLUTEC-nave-en-Pinto.png\" alt=\"\" class=\"wp-image-983\" srcset=\"https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/E-SOLUTEC-nave-en-Pinto.png 1200w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/E-SOLUTEC-nave-en-Pinto-300x200.png 300w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/E-SOLUTEC-nave-en-Pinto-1024x683.png 1024w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/E-SOLUTEC-nave-en-Pinto-768x512.png 768w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/E-SOLUTEC-nave-en-Pinto-700x467.png 700w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"800\" data-id=\"981\" src=\"https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/G-SOLUTEC-nave-en-Pinto.png\" alt=\"\" class=\"wp-image-981\" srcset=\"https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/G-SOLUTEC-nave-en-Pinto.png 1200w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/G-SOLUTEC-nave-en-Pinto-300x200.png 300w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/G-SOLUTEC-nave-en-Pinto-1024x683.png 1024w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/G-SOLUTEC-nave-en-Pinto-768x512.png 768w, https:\/\/solutec-construccion.es\/wp-content\/uploads\/2026\/03\/G-SOLUTEC-nave-en-Pinto-700x467.png 700w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>At SOLUTEC, a company specializing in the adaptation of industrial and logistics spaces, we are strengthening our presence in Madrid&#8217;s business hub with a new comprehensive project in Alcobendas.<\/p>\n","protected":false},"author":1,"featured_media":1621,"comment_status":"open","ping_status":"open","sticky":true,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"footnotes":""},"categories":[121],"tags":[125,124,123,126],"class_list":["post-1620","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics-warehouse-renovation","tag-logistics-warehouses","tag-solutec","tag-warehouse-renovation","tag-warehouse-revaluation"],"acf":[],"_links":{"self":[{"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/posts\/1620","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/comments?post=1620"}],"version-history":[{"count":1,"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/posts\/1620\/revisions"}],"predecessor-version":[{"id":1622,"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/posts\/1620\/revisions\/1622"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/media\/1621"}],"wp:attachment":[{"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/media?parent=1620"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/categories?post=1620"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/tags?post=1620"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}