{"id":2037,"date":"2026-11-04T08:57:19","date_gmt":"2026-11-04T08:57:19","guid":{"rendered":"https:\/\/solutec-construccion.es\/how-we-plan-the-hoisting-process-in-industrial-roof-renovation"},"modified":"2026-11-17T08:39:02","modified_gmt":"2026-11-17T08:39:02","slug":"how-we-plan-the-hoisting-process-in-industrial-roof-renovation","status":"publish","type":"post","link":"https:\/\/solutec-construccion.es\/en\/how-we-plan-the-hoisting-process-in-industrial-roof-renovation","title":{"rendered":"How we plan the hoisting process in industrial roof renovation"},"content":{"rendered":"\n<p>We are currently in the execution phase of a <strong>roof renovation<\/strong>, and right now we have a crane hoisting 10-meter-long sandwich panels to cover roof pitches at a <strong>height of 14 meters<\/strong>.<\/p>\n\n<p>This is a critical moment. We are executing the renovation of the warehouse roof without halting the client&#8217;s activity for a single minute. We maintain production lines at 100%, logistics remain uninterrupted, and the plant stays operational while we work. Achieving this continuity, while minimizing waste and impact, is key for the warehouse to obtain sustainability certifications such as <strong>BREEAM In-Use<\/strong>, which we have already secured in several of our projects.<\/p>\n\n<p>To ensure the client is virtually unaware of our presence, the maneuver is resolved days in advance: studying ground resistance to avoid blocking logistics, setting safety margins for wind, and inspecting every spreader bar at the truck side. If the hoisting is well-planned, the client does not even notice that we are replacing the roof of their factory.<\/p>\n\n<p>Ensuring this precision in warehouses at full capacity is only possible by combining years of experience in industrial roofing, a highly qualified technical team, and the maximum guarantee of execution for the asset owner.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We are currently in the execution phase of a roof renovation, and right now we have a crane hoisting 10-meter-long sandwich panels to cover roof pitches at a height of 14 meters. This is a critical moment. We are executing the renovation of the warehouse roof without halting the client&#8217;s activity for a single minute. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2038,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"footnotes":""},"categories":[122,121],"tags":[138,275,276,124],"class_list":["post-2037","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrial-warehouse-renovation","category-logistics-warehouse-renovation","tag-capex","tag-hoisting","tag-roof-renovation","tag-solutec"],"acf":[],"_links":{"self":[{"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/posts\/2037","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/comments?post=2037"}],"version-history":[{"count":1,"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/posts\/2037\/revisions"}],"predecessor-version":[{"id":2039,"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/posts\/2037\/revisions\/2039"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/media\/2038"}],"wp:attachment":[{"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/media?parent=2037"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/categories?post=2037"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/solutec-construccion.es\/en\/wp-json\/wp\/v2\/tags?post=2037"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}